Adaptec SAS RAID Controllers Instalační příručka Strana 30

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 148
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 29
16 Sun StorageTek SAS RAID HBA Installation Guide March 2010
5. Place a spacer over each screw.
The BBU connector on the HBA is just below the screw closest to the right edge of
the HBA.
6. Line up the BBU connector on the BBU module with the connector on the HBA.
The screws you inserted will line up with matching holes in the BBU.
7. Gently press down on the right edge of the BBU module until the connectors
click into place.
Caution DO NOT force the connection. If a gentle push does not mate the
connectors, realign the components and try again.
8. Obtain the three nuts from the BBU kit, and for each nut, do the following:
a. Place the nut onto the screw and hold the nut in place.
b. With the Phillips head screw driver, reach underneath the HBA and, while
holding the nut in place with your other hand (or with needle nose pliers or
tweezers), screw the plastic screw into the nut.
c. Repeat Step a - Step b for the remaining nuts.
Note If you are unable to place a nut onto the screw that is close to the heat sink,
use a small pair of needle nose pliers or tweezers.
Caution Do not over-tighten the screws.
Verifying the Current Devices on a
SPARC System
If you are installing on a non-SPARC system, skip to “Installing the HBA” on
page 17.
Zobrazit stránku 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 147 148

Komentáře k této Příručce

Žádné komentáře